Customer Name: Alcotekltd
Country: RUSSIA
Coating Line project: SSTZ1300-30 2-SIDES 2-COATING 2-BAKING COATING LINE & QX1300-40 PRETREATMENT LINE
Build Year: 2004
You can also learn about our other dual coating line products. We have the TZ1600-35 series 2-sided 2-coating coating line (pre-treatment coating separation line), the TZ1600-35 series 2-sided 2-coating line (integrated line) and Our TZ1600-40 double-sided double coating line (high-end version double coating line). If you have any other ideas, just contact us anytime.
Time: The coating line design and manufacture leads 120 days, installation and testing leads 70 days.
Trade terms: FOB, CIF are available
Payment terms: T/T, D/P, LC are acceptable
Packing style: Wooden pallet
Transportation: by sea